I don’t know how long that tan painted burlap-textured wallpaper has “graced” the main stairwell and rear entrance lobby walls of the Welshimer Library. Decades, I’ll warrant. Well, it’s gone now. Last week painters removed the wallpaper and repainted, and it looks great! I want to thank President Bill Greer who approved this project coinciding with the development of the Sesquicentennial Plaza behind the Library and the reopening of our rear entrance (which opens onto the plaza). Here are some photos chronicling the painting progress last week:
Milligan Library Life
by the staff of P.H. Welshimer Memorial Library & Seminary Library
Students and Library staff send Jake a Thank You card
Jake the Therapy Dog and his owner and trainer, retired Milligan College Biology Professor, Julie Wade have been visiting students in the Welshimer Library as a “de-stressing activity” during Finals Week every semester since Fall 2013. We were looking forward to planning for Jake’s visit again at the end of this semester when we learned earlier in the summer that Jake was retiring due to poor health. Library staff thought it would be neat to create a large Thank You card for Jake and invite students to write a message or sign.
The card was posted in the Library lobby during the week of September 12, with a great response from students. We contacted Dr. Wade and invited her to come by a pick up the card for Jake at the end of the week. Dr. Wade was very much moved by this out-pouring of appreciation from the students. What we didn’t know when we first proposed the idea was that Jake passed away in late July. So there was additional poignancy and emotion at our meeting. Jake will be very much missed.
Dr. Wade indicated that she intends to continue therapy dog training, which she views as a ministry. She just has to find the right companion. She assured us that she will stay in touch with us, and when the time is right she will return to the Library with a new friend to help students de-stress during Finals.
Library Prank: So early in the semester?!
Library housekeeping staff was greeted this morning by tables and chairs not in their accustomed locations…
All in good fun, no doubt. But please remember and have compassion on the folks who have to put everything back in its place.
Milligan Libraries welcomes Jude Morrissey as User Services Librarian
Please join us in welcoming Jude Morrissey to the Milligan Libraries staff. Jude is the new User Services Librarian at the P.H. Welshimer Memorial Library, taking over from Anne Reever Osborne, who relocated with her family to Nashville.
Jude received her BA in Religion and Philosophy from Berea College (2005), and her Masters of Library and Information Science from Louisiana State University (2012). Jude comes to us from New Orleans, LA, where she worked most recently as Circulation Supervisor for the Jefferson Parish Library. She first came to the New Orleans area with her husband (Michael) and two children (Madeline and Isaiah), as a recipient of an Institute of Museum and Library Services grant to participate as an intern at various library sites with Project Recovery (2010-12). From 2008-2010 Jude and her family lived in Thailand working as English language teachers.
As User Services Librarian, Jude oversees the circulation of library materials and everything related to you as a library patron and user—from making sure you can check out items to keeping you updated about library news and events on our blog, Twitter feed, or Facebook page. Jude also processes your interlibrary loan requests and supervises our student workers.
Welshimer Library Summer 2016 Interior Renovation Project
Milligan College’s P.H. Welshimer Memorial Library is receiving a significant interior renovation this summer as part of a campus-wide infrastructure overhaul intended to reduce energy consumption. President Bill Greer formally announced the initiative on Earth Day, April 22, 2016. The 55-year-old Welshimer Library building, will receive a new heating and cooling system, new ceilings and lighting, new bathroom fixtures, and upgraded network cabling.
The project got underway immediately following Graduation on Monday, May 9, and is expected to be completed mid- to late-July. Library staff vacated the premises, and setup shop in various seminar rooms and carrel offices at the Seminary Library, across the street on Emmanuel Hill.
Although the Welshimer building itself is closed to users, and access to physical book and media items severely restricted, most services will continue to be offered, including reference/research assistance and interlibrary loans. Access to electronic resources via the Milligan College Libraries website will, of course, be unaffected. The Seminary Library building provides excellent study and reading spaces, and is open Monday-Thursday, 7:30 AM-5:00 PM, Friday, 8:00 AM-12 Noon throughout the summer.
This post will be updated roughly once a week with new photos chronicling the renovation progress. We will communicate with campus via email and social media once the renovation is complete and we’re back in the building.
Don’t forget the “before” pictures!
I took the following photos on Monday, May 9, 2016, just before the demolition and renovation folks got in the building, to remind us how it used to be.
Main Floor Lobby
Main Floor (front)
Main Floor Reference Area
Wait. What’s this? A visitor on Library Front Lawn!
Main Floor “Atrium”
Main Floor looking from “Atrium” toward Lobby
Main Floor Back Room
Second Floor Stacks (front)
Second Floor Stacks (back)
Second Floor Stacks (back)
Basement Floor
Basement Floor
Basement Floor Compact Shelving
Basement Floor Hopwood Classroom
Basement Floor Archives
Basement Floor Archives
Here comes the demolition crew!
I took the following photos when the demolition crew arrived on Wednesday, May 11, 2016, and then recorded their progress on subsequent Mondays (currently updated to May 23). The guys started on the Basement Floor and worked their way up removing old lighting and ceiling tiles.
Dumpsters in waiting
Basement Floor Hopwood Classroom
Basement Floor Compact Shelving covered in plastic
Basement Floor Compact Shelving
Basement Floor Compact Shelving
Basement Floor Archives
Basement Floor Archives
Basement Floor
Main Floor covered in plastic
Main Floor covered in plastic
Main Floor Back Room covered in plastic and old lighting removed
Main Floor ceiling tiles coming down
Main Floor
Main Floor viewed from Lobby
Dumpsters filling up!
Second Floor Stacks covered in plastic and old lighting being removed
Second Floor old lighting fixtures piling up
Second Floor ceiling tile removed
Week 4 (May 31, 2016)
Checking-in following Memorial Day weekend. Most of the old ceiling tile hanger grids have now been removed. Most impressive, is seeing the exposed steel beams. They don’t build them like this anymore!
Main Floor Back Room
Main Floor Back Room exposed steel beams
Main Floor ceiling grid removed; new network cable going in
Second Floor ceiling grid removed
Second Floor exposed steel beams
Week 5 (June 6, 2016)
Work on the old heating and cooling system is underway. Most of the old ceiling duct grills have been removed on the floors, and preparation for the dismantlement of the old air handler in the Boiler Room has begun. New ceiling grid on the Basement Floor is nearly complete.
Original air handler system in the Boiler Room on the Basement Floor
Original control panel
Old cooling tower in enclosure outside Library building
New ceiling grid Basement Floor
New ceiling grid in Hopwood Classroom on Basement Floor
New ceiling grid in Archives on Basement Floor
Aaron on stilts installing new ceiling grid
Week 6 (June 13, 2016)
Not a whole lot to show this week photo-wise. New ceiling grid is almost complete on the Main Floor. I was also up in the attic today where some guys were working on rebuilding the upper air handler.
New ceiling grid Main Floor (front)
New ceiling grid Main Floor (back)
Guys working on rebuilding air handler in attic
Maze of duct work in the attic
Week 7 (June 20, 2016)
This week I see new ceiling grid going up on the Second Floor, and a lot of work is underway on the heating and cooling system. And wow! The concrete pad for the Sesquicentennial Plaza is in.
New ceiling grid on Second Floor
New ceiling grid on Second Floor. There’s Aaron on his stilts again!
New vent diffusers being tied into existing duct work. Hopwood Classroom on the Basement Floor
Trench for piping between chiller and cooling tower
Concrete pad for Sesquicentennial Plaza located at the southeast corner of the Welshimer Library
Overhead view of the pad for Sesquicentennial Plaza taken from Second Floor of Welshimer Library
Week 8 (June 27, 2016)
This week’s visit to Welshimer Library shows heavy work going on outside related to the heating and cooling system. Inside, new vent diffusers are going into the ceiling grid and being tied into existing duct work. I was also present for installation of the first of the new ceiling tiles. The project manager mentioned that installation of new lighting was supposed to begin today as well.
New pipe going into the trench between the Basement Floor Boiler Room and the exterior cooling tower
Old cooling tower removed
Rebuilding of existing air handler in the Attic continues
New vent diffusers and tie-ins with existing duct work on Main Floor (back area)
Very first of the new ceiling tiles going into the Hopwood Classroom on the Basement Floor!
Week 9 (July 5, 2016)
This week we see that installation of new high efficiency LED lighting has been completed on the Basement Floor and most of the Main Floor, with installation on the Second Floor getting underway. Tie-ins from ductwork to new ceiling diffusers continues. New integrated chiller has been installed; piping completed; and dismantlement of old chiller and furnace is underway.
New lighting on Basement Floor
New lighting on Main Floor (front area)
New lighting on Main Floor (back area)
New LED light fixtures ready to be installed on Second Floor
New integrated chiller installed where old cooling tower used to be
Chiller piping trench filled back
Old chiller in Boiler Room to be dismantled
Old furnace before being dismantled
Old furnace being dismantled
Old piping from furnace and chiller
New ceiling tile and lighting going in at the top of the main stairwell
Week 10 (July 12, 2016)
Highlights at the beginning of this week include the essentially complete installation of lights and ceiling tile on the Basement Floor; nearly complete installation of lights on the Main and Second Floors; and beginning installation of ceiling tile on the Main Floor. Work also continues on HVAC machinery.
Lights and most of the new ceiling tile installed on Basement Floor
Lights in and new ceiling tile going in on Main Floor (front area)
Lights in on Main Floor (back area)
Lights and duct work tie-ins installed on Second Floor (stacks area)
Boxes of new ceiling tile ready for installation on Second Floor (stacks area)
Pipe and valve tie-ins to new chiller complete
Week 11 (July 18, 2016)
This week I see the old furnace, chiller, and air handler has been removed from the Boiler Room. Plastic sheeting has been removed, and general cleanup is underway on the Basement Floor. New lighting and duct work installation appears to be complete on all floors. New ceiling tile installation is nearly complete on the Main Floor, and well underway on the Second Floor.
Old air handler, chiller, and furnace removed from the Boiler Room
Old furnace flue
General cleanup underway on Basement Floor
Hopwood Classroom on Basement Floor almost completely back in shape
Library lobby on Main Floor
Welshimer Room on Main Floor with new lighting
Chandeliers from Welshimer Room likely won’t be reinstalled. New ceiling is a bit too low.
Main Floor (front area)
Main Floor “Atrium” (looking west)
Main Floor looking from “Atrium” toward Lobby
Final ceiling tiles going in on Main Floor (back area)
New ceiling tile going in on Second Floor
Second Floor with new ceiling, lights, and duct work diffusers
Second Floor study area viewed from stacks
Week 12 (July 25, 2016)
This week work continues on the heating and cooling system in the Basement Floor Boiler Room and attic. (Look at the size, I mean the smallness, of those new boiler units!) Ceiling tile installation is almost complete. IT is re-installing the wireless nodes on all floors. Plastic has been removed and cleanup is underway on the Main Floor. Finally, I see wood being delivered for covered enclosure on the Sesquicentennial Plaza outside the Library.
Two new boiler units being installed. These are going to heat the entire building?! That’s incredible!
Rebuilding of air handler in attic continues
New chiller coil for attic air handler. I understand it was a huge job getting this thing into the attic. Indeed, it’s roughly 3 feet tall and 10 feet long, and looks to weigh several hundred pounds.
Circulation Desk area on Main Floor lobby starting to return to normal, except for new ceiling and lighting
Welshimer Room on Main Floor with new ceiling and lighting
Main Floor (front area) pretty much cleaned up with tables and chairs back in place
Main Floor (back area) coming back together. Michael is re-installing a wireless node.
Another view of Main Floor (back area)
Wood being delivered to start work on covered enclosure on the Sesquicentennial Plaza outside the Library
Week 13 (August 1, 2016)
Everything on the inside of Welshimer Library is basically finished except for heating and cooling equipment installation, and a final cleaning on the floors. As of today, there still wasn’t any functional cooling, though I am told this should be coming soon, at least from the attic chiller. On the outside, work on the Sesquicentennial Plaza has happened very quickly, with near completion of the pergola and landscaping.
I am going to wait on a complete “after” photo walk-through until the final cleaning on the floors is finished. In the meantime, here are a few shots of on-going work on the heating and cooling system in the attic and basement, and the Sesquicentennial Plaza.
Attic air handler with new chiller coils and fan drive installed. Looks like it just needs to be plumbed before it can start pushing some coolness into the building.
Water pumps and piping being installed in Basement Boiler Room. Boilers are there (on the right), but we are still waiting for cooling equipment to arrive and be installed.
Can you believe this, after only a week?! This structure, which is the focal point of the Sesquicentennial Plaza, is called a pergola. According to Wikipedia, a pergola is “a garden feature forming a shaded walkway, passageway, or sitting area of vertical posts or pillars that usually support cross-beams and a sturdy open lattice, often upon which woody vines are trained.” Donor bricks will be installed in the walkways leading to the pergola. The plaza area has also been nicely landscaped. Tables and chairs and decorative exterior lighting is also included in the design.
Soon, the back entrance to the Welshimer Library (here very neatly landscaped), which has been closed for over 10 years, will be re-opened for traffic in and out of the building.
Week 14 (August 8, 2016)
This week, work continues on the HVAC system in the Basement Boiler Room (full system won’t be ready for start of school, but I’ve been told we should have partial cooling from the attic handler), tables and chairs arrived for the Sesquicentennial Plaza (the front porch of the Library will also be getting a couple of these!), and the professional cleaners are here to begin dusting of shelves, and deep cleaning of floors and carpets (our very own Housekeeping folks will be following-up with a fresh waxing).
Tables and chairs delivered to the Sesquicentennial Plaza
Old concrete tables and chairs have been removed from the front porch of Welshimer Library and will be replaced by a couple of sets just like these on the Sesquicentennial Plaza
The best concrete benches from the porch have been moved down to the landing in front of Welshimer to create this nice enlarged seating area
These are the guys who moved all that heavy concrete patio furniture. Thanks!
Here come the professional cleaners!
Week 15 (August 17, 2016)
I’m reporting a bit late this week because I wanted to capture the arrival and installation process underway of the new air handler and chiller coils in the Boiler Room on the Basement Floor. The attic chiller was turned on Friday (at last!), and after we closed all windows and blinds and set up several box fans on the Main Floor, the building started cooling down nicely over the weekend in time for our orientation events on Monday and Tuesday. Also, with the Sesquicentennial Plaza essentially complete, we also took steps today, on this first day of classes, to reopen the back entrance to facilitate traffic in and out of Welshimer Library.
New air handler unit and chiller coils being moved (through the window) into the Boiler Room on the Basement Floor
Various pieces of new air handler assembled. Soon we’ll have proper (heating and) cooling for the entire building.
David putting banner up on front landing to welcome students back
Mary tries out nice new tables and chairs on front porch
View of Sesquicentennial Plaza from back Library entrance
Back Library entrance now open. Come on in!